Showing posts with label hillside park. Show all posts
Showing posts with label hillside park. Show all posts

Monday, November 10, 2014

The nonsensical protest around Hillside Park



Protesters against paving Hillside trails, ironically standing on a spot where they've already been paved for a decade. (photo credit: James Jackson)

I recently read about protests against plans to pave the trail surface in Hillside Park, and I am disappointed. While the residents of Ferndale Place raise a legitimate concern about how city staff notified people about upcoming work, the complaints that a few unhappy citizens are bringing forward just don't make sense. 

One complaint is that upgrading the trail surface will ruin this park as a natural gem. As a daily user of the park, I can attest that the park is a beautiful natural oasis, but less than two years ago it was a muddy construction zone filled with heavy earth moving equipment. If the park can survive a sewer replacement, it can withstand a paved trail.

Sewer reconstruction in Hillside Park: where were protesters then?

Furthermore, worries about "environmental damage" completely ignore the current reality. I saw gravel trails washed out by stormwater three times in 2014 alone, and countless times before. After each incident, heavy vehicles truck in tons of new stone and sand to repair dangerous washouts that are sometimes a foot deep. With each new storm, this material is spread into meadows and silts up the creek. A hard trail surface will permanently solve this problem and prevent injuries.

Storm runoff gouged this gravel trail down to the foundation layer in 2014.

What is lost in these protesters' message is how Hillside Park's degraded, loose gravel trails make it inaccessible to many in our community. Paving the trails will improve accessibility for all: in wheelchair or mobility scooter, with stroller, as well as on bike or on foot. Virtually every other city park provides paved trails without diminishing the natural environment, including Forwell Creek Park which directly connects to Hillside, so that they are not a barrier to those of us who struggle with mobility challenges.

The concerns of a few residents who don't want any changes need to be weighed against the needs of everyone. Accessibility must trump aesthetics. Hillside Park is a public space, not a private backyard.

Wednesday, December 4, 2013

Waterloo really does bike!

There's a lot going on in Waterloo for bikes. And I'm not just talking about Waterloo Bikes (though they'll come into it). Maybe when they took the fluorine out of the water, they put something else in, because change is afoot in Waterloo-- real physical change, and change in perspective.

Uptown Protected Bike Lanes?


Let's start with the changing attitudes. I've raised the Uptown Streetscape improvement plan before but this fall it came back to the public with a preferred option. One that included bike lanes and reduced traffic lanes. That on its own really says how far we've come! We can actually talk about converting uptown's King Street away from a 4-line thoroughfare, into a complete street serving all users.

But, as proposals go, it wasn't perfect. It's the barest of concessions to bikes and doesn't really provide a welcome cycling environment to attract serious use. So Graham Roe of Waterloo Bikes, as well as yours truly, both spent some time going over the possibilities of protected bike lanes in uptown Waterloo. I put together a detailed post up on TriTAG's blog, which led to a CBC radio spot to discuss the idea. Also, a lot of great conversations during and around the public consultation.
Protected bike lane on Kinzie in Chicago

Graham has carried it further. He has spoken to the issue on radio as well, and even started and promoted a petition that edges towards one thousand signatures.

I think we've moved the needle on this one. But that is largely because it is an idea we're ready to seriously discuss, and a lot of people are realizing they'd bike if the infrastructure was accommodating. This matches what other cities have discovered-- just how many people would move around by bike if they felt it was safe and convenient.
Courtesy: Transitized

And when you throw in a study which demonstrates the rise of alternative transportation in our uptown core, we can paint a picture of a city in transition, both in thought and action.

I might have accused Waterloo in the past of losing its mojo. It seems reports of its demise were greatly exaggerated.

But wait... there's more.

Waterloo Interior Loop is a Real Thing, except for the Loop part


The city of Waterloo presented its latest public information centre on the so-called Interior Loop that I posted about before. Details and boards from the latest PIC are available on the city's website here.

Options have been condensed to concrete proposals and intentions. While the "Loop" aspect of the Interior Loop is still lacking a key piece on its north side, the rest of the trail has received very detailed, systematic examination.
Just two of two dozen points of improvement.

We see consistent crossing treatments, strong signage, trail infill, realignments and surface improvements. All to create a navigable, accessible trail. It's hard not to like, but easy to underappreciate-- this kind of systematic standard-setting usually just doesn't happen.

Okay, so there's still a failure to address the Weber St. crossing of the Laurel trail north of Lincoln. Only marginal improvements will be delivered there this time round. But on the other hand, we have real improvements that will be delivered in 2014, and are already budgeted.

Some of the expected (by me) local resistance to trail improvements has not emerged. In fact, I've heard support for the all-important resurfacing of Hillside Park trail from local residents along warnings about flooding problems that need to be handled.

Winter maintenance is still not on the cards, though.

Meanwhile...

Columbia St. W and Lexington Road Upgrades


Waterloo continues to knock off deficiencies in its east-west network. Out in the west end, a $10M widening project will add lanes, roundabouts, sidewalks and "raised" bike lanes to Columbia between Fischer-Hallmann and Erbsville. This marks the first use of raised or separated bike lanes in Waterloo. There's some chatter about whether the 4-to-2 lane adjustment makes sense on this stretch, but I'll leave that for others to worry about. Hopefully Waterloo also learned to do bike lanes and roundabouts better than this dangerous setup.
DO NOT WANT

East of the expressway, Lexington Road may see new sidewalks, bike lanes, and a multi-use trail between Davenport and University. The Public Information Centre for this is on Wednesday 11th December at Waterloo Mennonite Brethren Church (details). Can these changes be carried through successfully? It may depend on the reaction of residents on Lexington who may prefer to keep their streetscape as-is, if nobody else shows up.

I'll show up. Preserving "the look" and even a few trees can't trump basic human accessibility on foot. We're talking sidewalk on just one side, after all.

Of course, all this leaves an elephant in the room: the stretch of Lexington/Columbia between Davenport and King-- across the expressway, through four massively overspecced lanes, past a nasty choke point at Marsland and through busy Weber. This will be the hardest to deal with, but as I've pointed out before, the most necessary. Waterloo has already blinked once, but as the rest of this corridor comes together, it gets harder and harder to ignore.

What I'm wondering: with a proposed south-side multi-use trail east of the expressway, has someone tipped their hand? Does the city have something up their sleeve for overpass improvements? Has MTO softened their stance on bridge changes to improve walking and cycling?

What about Kitchener?


That's what's great about living in these twin cities. We have two (or four, including Cambridge and the regional government) chances to see good things done well. Of course, it's also two (or four) times as hard getting broad sweeping improvements through region-wide. You take what you can get.

Today, though, Waterloo gets the spotlight. They're bringing some really positive change forward, and more exciting change seems tantalizingly close.

Let's make it happen.


Thursday, September 19, 2013

Waterloo Trail Improvements - summary

These are based on my recollections and conversations at the open house Wednesday.

The "Interior Loop Trail" (contest to come up with a name!) was the showcase of the proposal, and was generally positive, though with some caveats.

Link to PDF
Positives:

Overall, it's ambitious (as trail improvement plans go) to address this route so systematically, and with (according to staff) a lot of potential for change to take place even in the next year. Creating a loop enables a lot of different trips, not just back and forth from uptown, but from neighbourhood to neighbourhood in the north. Improving the quality and consistency of the trail, and taking a serious stab at wayfinding aids, are also welcome.

In addition, a lot of intersections and crossings would be improved. Not a huge amount of detail here, but again the term "systematic" really jumps to mind. Virtually every trail segment and intersection has been looked at.

Downsides: 

As you can see, it won't be a "loop" for a while. In the north is a large section that remains to be worked out, with a couple of possibilities (working out an agreement with Waterloo Inn if/when they redevelop, or following city-owned land close to the highway). But they're still conceptual.

Another small gap lies in Uptown, in the King St. area, though that's not surprising given the LRT construction plans. Also, LRT is responsible for delaying surface improvements in Waterloo Park. But, the same project may yield opportunities to extend paths and trails along the rail corridor up to Northfield and beyond (...St. Jacobs?) This intriguing possibility was raised by Jan D'ailly, chair of the Waterloo advisory committee on active transportation (WACAT).

Other noteworthy items:

Carter and Mackay streets (between Weber and University on the south-east side of the loop) are being proposed with sharrows. I had a discussion with a staffer about whether this was appropriate or desirable. These streets are very low volume wide residential streets, with sparsely used on-street parking. It could be that sharrows will be benign here, and useful wayfinding devices. It struck me as an odd context to apply sharrows in, though.

The proposed trail crossing at Weber/Mackay is still a work in progress. A couple of options were presented. This crossing will be a challenge, but also of great benefit.

Big picture:

The trail system in Waterloo is still disjoint and inconsistent, but this proposal would be a major step in bringing it together if it is followed through.

For cycling, the way we should look at the trail system is as a place where very casual or novice cyclists of any age should feel comfortable and confident to ride. Unfortunately with all of the current breaks, bad intersections and lack of signage, they are not so appealing. When a gentle trail is interrupted by 4 lanes of speeding traffic without any crossing, it is effectively a dead end for many people.

The city of Waterloo should be congratulated for attacking this problem. It's not a perfect proposal, and it's not a complete solution. But as incremental improvements go, this one is bigger than most.

Now we need to see it happen. And that's where we come in: to provide feedback and shape the proposal, and then to be willing to speak to council about the benefits it will bring.

Stay tuned.

Wednesday, September 18, 2013

Waterloo Trail Improvements Open House: TONIGHT!

The City of Waterloo is proposing big trail improvements over the next few years. There is an open house on the trail improvements tonight:

Wednesday, Sept. 18, 2013
6 p.m. to 8 p.m.
Waterloo City Centre (City Hall)
100 Regina Street South

If you walk or cycle in the city of Waterloo and in particular on the trails below, you should check out http://waterloo.ca/atprogram for more information and drop in tonight!

Original PDF here

Note: For those with sharp eyes (it's come up a couple of times) University Avenue at Carter/Hillside Trail is not listed for crossing improvements because a crossing island is already planned there for 2014 as part of regional road reconstruction.

But don't let that stop you from coming down to the open house! This proposal deserves support and maybe you can help provide some constructive criticism.

 
 

Friday, August 3, 2012

[LOABkw] An uneventful week

It's actually a relief that this week's getting around town without a car was uneventful. The two weeks prior provided lots of fodder for blog posts, but it wears down a fella, you know?

One big milestone this week though. I've now cycled 1100km for the year. That matches the high water mark I set in 2010: from now on, every ride is personal-record-setting. I'm confident that I can break 1500km, and considering setting my sights on the 2 megametre mark.

There was some minor, though not unpleasant shifts in the routine this week:

Monday: My company's Habitat for Humanity build day! I was presented with an opportunity to cycle commute somewhere completely different: Howe Drive, near Westmount and Highway 8. That was a pleasant ride, almost all trails and side road, though I did discover that Concordia Park has the same sewer affliction as Hillside Park: trail closure for construction forcing me to detour.

That's me, doing a Here's Johnny under the armpit of the top right orange guy


I'm impressed with trail connectivity on Kitchener's southwest side, though the expressway remains an obstacle. I was glad I didn't have to go any further south along Westmount than the 50m or so it took to get from trailhead to build site.

Also, no lost appendages or broken limbs. A total success!

Tuesday: TriTAG hat on for the afternoon, to have a meeting with Waterloo city government and a developer. Which meant dressing up beyond the usual standards for a software geek, and arriving Uptown without being dripping with sweat.

Which, sadly, meant leaving the bike at home. Fortunately, there's GRT: once again, going car-free means going multi-modal. As demonstrated with the flat tire incident last week, part of good cycling infrastructure is a good transit system.

The rest of the week: The aforementioned Hillside Park sewer construction work is progressing. Over the last couple of weeks, I saw some depressing signs of construction crews taking two steps forward, one step back:

A lovely concrete footing for the new bridge.


The same concrete footing, two days later.

Finally, on Thursday:

We have a bridge!
The Hillside Park work can't end soon enough for me. It's my preferred cycling route (and a great way to get from Lexington to the Lincoln neighbourhood), and it has been closed all year. Originally supposed to be done in Spring 2012, and then in mid-July, I admit I will be surprised if it reopens in August. But it's getting closer.

A few other route alterations from routine: a trip down the Iron Horse to pick up a piccolo from a prescribed piccolo drop-off point (don't ask), and a trip to the chiropractor this morning which meant tackling the Lancaster/Bridge roundabout, and Bridge St (a route that I have grown increasingly unhappy about). At least the construction signs are gone.

Erin returns this afternoon for a weekend off from birdnerding. Two whole days with her this time! Maybe I'll sneak the Matrix out to fill water jugs so I can brew on holiday Monday. That isn't cheating, is it?