Showing posts with label northfield. Show all posts
Showing posts with label northfield. Show all posts

Wednesday, March 13, 2013

Waterloo GRT Improvements: Modified!

Heads up: the previous post on this topic contained a description of the proposed 2013 GRT improvements that has since been modified.

Here's the new map:


You may need to click through to see it in detail, or view the original PDF.

One big change: the 201 iXpress will not run to Blackberry campus. Instead the 202 iXpress will extend from RIM campus to Conestoga Mall.

This is a bit of a surprise, but the lesson is never assume something is final until it is final. Even this plan may be subject to change, based on public feedback, online or at one of the PCCs:

Monday, March 1812 p.m. to 4 p.m.
University of Waterloo
Student Life Centre, Great Hall
200 University Ave. W., Waterloo
Tuesday, March 194 p.m. to 8 p.m.
Kitchener Waterloo Bilingual School, Gymnasium
600 Erb St. W., Waterloo
Thursday, March 21 (This PCC will include information on the proposed 2013 Fare Change)
4 p.m. to 8 p.m.
Waterloo Mennonite Brethren Church, Chapel
245 Lexington Rd., Waterloo
Friday, March 22 (This PCC will include information on the proposed 2013 Fare Change)
12 p.m. to 4 p.m.
Wilfrid Laurier University
Fred Nichols Campus Centre, Concourse
75 University Ave. W., Waterloo

 Happy travels!

Saturday, February 23, 2013

Waterloo GRT improvements

Attention: Details of this post are now out of date. Please see the updated details here.

The latest regional council Planning & Works agenda contain details of GRT's proposed service improvements for later this year. I wrote about this previously when multiple options were being presented to the public. They've taken in the feedback, and are now coming back with a single proposal for public consultation.

And, it is good. Very, very good.


(You'll probably need to click through to see it legibly.)

Grand River Transit has taken feedback to heart, especially from those of us who encourage them to look for opportunities to move our transit routing strategy away from hub-and-spoke and towards grids. Here's how they have done so:

  • Route 35 provides very direct north-south service along Bridge and Lancaster, with time-wasting loops cut out.
  • Route 6 trades its Downtown Kitchener destination for Uptown Waterloo, and interlined with the 5, it provides a solid east-west gridline.
  • Route 31 runs virtually all of Columbia/Lexington right across town: it no longer enters U of W campus.
Of course, there is also the major addition of the University Avenue express, which doesn't quite stick to University Ave in the west end but still cuts an easily understood path across town. 201 iXpress is also extended, to cover the densest portions of Columbia before turning towards Conestoga Mall and Northfield. This route is a little ideosyncratic but may improve the usefulness of this route that currently looped back at the universities.

And crucially, each will cross the LRT line, though some work must be done to provide a sensible transfer at U of W campus.

Overall, this is a solid set of improvements. But like all route changes, it will inconvenience some who may have located themselves to benefit from the existing route structure. Still, many of them will still have access to transit, and new alternatives available. And many more will be in a position to take advantage of transit. For instance, one coworker of mine has already happily observed that his home near Columbia/Westmount now has transit options to our workplace near Bridge/Northfield.

(These improvements are extremely good news for Bridge/Northfield, especially in light of plans to develop a multi-use node at this location. Large portions of the surrounding area will have transit access to this point, though it remains to be seen if people will take advantage of it in this very car-oriented suburban part of Waterloo.)

Good job GRT!

If you want to read more, TriTAG has a writeup on the proposal here. Also, here is the list of proposed stop locations for both iXpress routes, mostly sticking to their 400m stop placement minimum:



Friday, November 9, 2012

Waterloo Route Shakeup!

Edit 2013/02/23: GRT has released a "preferred option" proposal. You can read about it here.

Edit 2012/11/10: GRT has now released its official options and I have revised this article to use the new images and corrected for details that have changed since the council submission.

Big changes coming to GRT, mainly within the city of Waterloo. The establishment of the 202 "University Avenue Express" and the extension of 201 iXpress require some rethinking of existing routes. The region is looking for public input on a number of options at public consultation centres being held in November. Are you going?

It has taken me a while to process the east Waterloo options. And to my disappointment they still haven't been properly published. Everything below is pulled from the region's Planning and Works agenda document (warning: big PDF), starting around page 115. You can now see GRT's official options here. Note that they differ slightly from the P&W agenda.


There are three "east" options being presented.

In all options, the 201 Fischer-Hallmann iXpress is extended past the university to Conestoga Mall, and then on to Northfield & University. The University iXpress also terminates here, but how it gets there is different.

Also, 6 and 35 are "crossed": they swap their downtown endpoints, 6 goes to Uptown and 35 goes to Downtown. In doing so, they are much straighter than before, which helps them act as better grid participants. Presumably 6 will be linked to the western 5 route at Uptown, as 35 was before.

The Contenders


East Waterloo Option 1 showing route details.jpg
Option 1


Option 1 is probably the simplest. The University iXpress left-turns at Bridge St. Apart from the 6/35 swap, eastern routes remain largely unaltered (12 is tweaked.)

Strengths:
  • Bridge St. is well served, at least between Northfield and University.
  • 35 is now an (albeit slow) north/south route.
  • The future "minor node" at Northfield and Bridge is very well served, with access to it for much of the northeast area. (Disclaimer: I work here and this is personally important.)
Weaknesses:
  • Duplication of iXpress between Northfield/Bridge and Northfield/University
  • There are three ways to get from Northfield/Bridge to Conestoga Mall. Seems excessive.
  • 12 is almost completely pointless in this configuration. Only a fraction of possible trips on the 12 are not provided by other routes, faster and more frequently.
East Waterloo Option 2 showing route details.jpg
Option 2


Option 2 really shakes things up. The University iXpress stays on University. 35 is (partially) straightened out. 31 shortcuts along Bridge St.

I see this option as intriguing, but flawed.

Strengths:
  • 35 starts to resemble a legitimate grid participant along the east side.
  • 6 (presumably cross-linked to the 5 on the west side) is a nice east-west grid line.
  • An intriguing new route for the Lincoln neighbourhood.
  • Less iXpress duplication.
  • A more useful 12; Weber St. north of University finally sees some service.
Weaknesses:
  • 31 is a monumental waste. It provides some minimal value along Lexington and that's it (and there isn't much along that stretch, either). Short-cutting it up Bridge makes no sense: whose time are you saving? The people trying to reach Conestoga Mall, who could take 201 or the new Lincoln route instead?
  • 35 is half-heartedly straightened out. Its remaining neighbourhood wander diminishes its value as a way to get up and down the east side by adding substantial delay (close to 10 minutes.)
There is one small change that makes this option a lot more compelling: swap the Eastbridge detour from 35 to 31! Now you have a less useless 31, and a more direct 35. Everyone wins.

I would like to see 35 continue to adhere to 6's old Wellington St. route, too. That would help it remain useful to me, personally, as well as the rest of the Mount Hope/Breithaupt neighbourhood which is not well connected to the East side at all in this arrangement. One big change from the original council packet is that 35 serves Wellington like the 6 does.

East Waterloo Option 3 showing route details.jpg
Option 3


Option 3 puts 31 in the configuration it should have had in Option 2. 35 is bent and spindled past recognition. 12 is cut short

I'm not sure which of Options 1 and 2 are the Good and the Bad, but Option 3 is definitely the Ugly. This is a disaster for anyone trying to get up and down Bridge St.

Strengths:
  • Nothing that Option 2 doesn't already accomplish better.
  • Demonstrates the routing that Option 2's 31 should have.
Weaknesses:
  • Complete failure to provide a north/south grid route on the east side.
  • Big degradation of service for the Bridge Street corridor, accessibility to the Bridge/Northfield minor node.

Additional Thoughts on All Options

The new University iXpress provides a nice east-west route through the university district and it will be very valuable in either of its two proposed routes. In one configuration, it provides the Bridge St. corridor with good service. In the other, it ventures into the less developed University East area, but in doing so it might be a more "legible" route.

Of course, by doing that, people might start to ask "Why not make it University Avenue all the way across?" And why not? Combined with a sold Erb/Bridgeport limited-stop route through Uptown, we might have something viable. But that's not in the cards...

If we run the University iXpress up "around the horn" instead of Bridge St., it opens up a compelling routing for the 35 as an east-side north-south connector. But it needs to be more direct than Option 2 shows, sticking to Bridge and Lancaster all the way to Wellington or Victoria. (Though the short Auburn Drive detour at University is reasonable.)

While I would love to see 4 bus routes converge at Bridge and Northfield, and keep my current bus route to work, I have to say that Option 2 is probably the best starting point. Swapping Eastbridge detour duties from 35 to 31 is a no-brainer.

But what about what is possible, but not presented? TriTAG member Duncan Clemens has put together his vision of a restructured route network in this google map. He has some of the same ideas: Use Bridge and Lancaster as a corridor. Make 31 pick up the Eastbridge neighbourhood slack.

Hopefully the PCC will provide opportunities for some of these good ideas to bubble up to the surface. And hopefully we'll end up with something globally useful, and not deformed by competing self-interest.




Thursday, May 10, 2012

North Waterloo Tidbits

The region has passed its staff recommendations to create proper cycling lanes for Bridge St. between Northfield and Lexington, including eliminating the southbound turn lane at Lexington.

The city appears to have passed the zoning changes requested for building a new plaza at Bridge and Northfield.

And today, while cycling up Davenport, I had a brief chat with a construction worker about the curious new pole they've installed... in the northbound lane. Traffic is, of course, being diverted around it. Turns out that this is the start of roundabout work at Davenport and Old Abbey. Which should fix the horror they made of the cycling lane there.

Edit: The Record's picked up on the pole oddity. The picture is hilarious.

Friday, April 6, 2012

Bridge/Northfield and the Poor Pedestrians

Addendum: After sending this letter I did receive a response. Most of the pedestrian concerns are addressed, including sidewalk access along the fronts of the development and to the bus stop/path access, and pedestrian refuge at that point-- provided by the developer.

It's still a very suburban development that in some places pays lip service to vibrant streetscape concepts, and there will be difficulty at the Labrador intersection, but the worst concerns for pedestrians are addressed.

I work very close to a proposed mixed-use development at Bridge and Northfield. As I'm a transit user as often as I'm a driver or cyclist, pedestrian access in the area is very important to me. And it's awful: impossible intersections, missing sidewalks, no lighting.

I'm hoping that the development will bring with it some improvements to the intersections and pedestrian infrastructure (like, you know... sidewalks) but I'm trying to drive the point home with Waterloo city council none the less.


The following is from a submission I put together this holiday morning:


To whom it may concern,

I work at a business near Bridge St. and Labrador St. in Waterloo. I am writing to express my support for the amendments to allow development of a mixed-use node at Northfield and Bridge. At the moment, this part of town has almost nothing commercial to support the many people who work and live in the area, and plans I have seen of the development are, if not perfect, at least working towards the goals of higher density and infill development.

As a driver, transit user and cyclist, I urge council to take into account transit, pedestrian and cycling access in this area when looking at the developers’ plans and the infrastructure needs they generate.

Most urgent is pedestrian access: there is no suitable pedestrian access to Northfield or Bridge along this property, despite the presence of GRT stops and pathway connections to residential neighbourhoods. The intersection at Bridge and Labrador is now extremely busy at rush hour, with dangerous left turns and aggressive drivers making Bridge almost impossible to get across for those on foot. The proposed development will only make this worse, so these problems must be addressed before the development is complete.

On transit, there are two GRT bus routes which serve this intersection now (31 and 35, connecting from Conestoga Mall to U of W and Uptown respectively) and in 2013 GRT plans to implement and extend 2 iXpress routes through this location, providing express access to much of the city of Waterloo and connections to future LRT.

Because of this, city council should push for more density and reduced parking for the buildings at this site. We don’t have a lot of open space to infill and this is a great opportunity to define an anchor for this area. It should not be wasted.

I have attached a map and photos to demonstrate some of the problems I have seen in the area. If the city addresses these problems promptly, this development would be a major benefit to the area. Without that support, however, I see the increased traffic becoming a major threat to my personal safety whether I am on foot or in car.








 View from Bridge St. bus stop, looking towards Labrador and Northfield.

Congestion on Bridge cuts visibility, and forces left turners from Labrador to turn blind onto Bridge. They routinely use the median as a merge lane. Southbound traffic often dives into the paved shoulder to avoid.

This makes pedestrian crossing at Labrador almost impossible, and crossing at the bus stop location necessary (but still dangerous.)

This intersection would see additional traffic from a new development and needs to be upgraded. Pedestrian access to the development needs to be addressed.